metal background
Northeastern Local Schools

Floorplan and Exterior as of 10/22/2018

Monday, October 22, 2018

This drawing shows the current plan for first and second floors of the new two story MS/HS building. Please note that the second floor of the drawing is shown over the existing football and baseball field. The second floor actually fits on top of the first floor drawing and does not infringe upon the football and baseball field. Those areas will not be disturbed.

 

This exterior view shows the preliminary exterior plan for the new MS/HS building. Final design is yet to be decided. Please note that the color of the brick shown is for illustration purposes only. The actual color of the brick will be chosen at a later time looking at actual brick samples. Our goal will be to choose a brick type and color that fits with the current elementary building and campus. Again, this is a Preliminary rough draft of our schematic design of our new facility that is subject to change as the process moves forward.